top of page

Contact us for a free in-person training.

Single Family/Duplex/Townhouse - 2015 IECC Residential - Performance Path:

Compliance Tool: HERS Software - IECC Performance Report

Deliverable: Compliance Report, Inspection checklist + Optional Plan Review for Air Barrier Details

Verification: HERS type verification at rough and finish

Testing: Air Infiltration Test at Finish (≤ 5ACH50 for PA) Duct leakage test at rough or final,  leakage to outside test at final (not mandatory target) to take credit for air infiltration reduction

Deliverable: As-Built Compliance/Signed Test Reports

DESIGN PHASE

CONSTRUCTION PHASE

bottom of page