top of page
Contact us for a free in-person training.
2016 ASHRAE 90.1 - Energy Cost Budget:
Compliance Tool: eQuest. ASHRAE 90.1 ECB tool can be used to compile information.
Deliverable: Compliance Reports + Select Additional Efficiency Package (IECC Prescriptive only) + Optional Plan Review for Air Barrier Continuity + Optional Cx Plan or Cx Plan Review
Verification: Verify continuous air barrier across building envelope in preparation for air infiltration test. Optional Field Cx for Mech, Service Water Heating and Lighting
Testing: Air infiltration Test (C402.5) to meet target of 0.40 CFM/sq ft of building thermal envelope.
Deliverable: Signed Test Results, Optional Preliminary and Final Cx Reports or Field Verification reports
DESIGN PHASE
CONSTRUCTION PHASE
bottom of page