top of page
Contact us for a free in-person training.
Other Multifamily - IBC Code - 2018 IECC Residential - Performance Path:
Compliance Tool: HERS Software - IECC Performance Report
Deliverable: Compliance Report, Inspection Checklist + Optional Plan Review for Air Barrier Details
Verification: HERS type verification at rough and finish
Testing: Air Infiltration Test at Finish (≤ 5ACH50 for PA); Duct leakage test at rough or final, leakage to outside test at final (not mandatory target) to take credit for air infiltration reduction
Deliverable: As-Built Compliance Report/Signed Test Reports
DESIGN PHASE
CONSTRUCTION PHASE
bottom of page